Visualisez notre vidéo de démonstration en ligne et appréciez la simpilicité d'utlisation du Basic MOST pour déterminer les temps de toutes vos activités.
Implementation of the 5S process at ADF’s. | Temoignages
Christophe GIRAUD’s Experience,
ADF Energy-Development Manager.
The 5S method is part of our
group’s constant
policy of improvement.
We must offer our clients the perfect quality
of services.
We had decided to call on an expert office with
know-how and experience in this field in order to reach our objectives.
On
September 2008, we conducted a prior
consultation process.
The competitiveness of PRISM’s offer, their
knowledge of fieldwork and their pragmatism were predominant assets in
our
choice.
Implementation of the 5S process at ADF’s. | Temoignages
We launched our action in the
PACA region on
October 2008, although our national implantation could have led us to
start
this process in other places.
In fact, the PACA region is
very representative
of our activities in the area of industry-related services.
In particular, this region presents all the
components of the Group through which we wanted to set up this process
(workings centers, maintenance contracts).
The
actions conducted by PRISM in the PACA
region were entirely satisfactory:
Simplicity
and efficiency of the process
Quality
of debriefings
Accuracy
of analysis
Besides,
the results we got generated within
the ADF Group a real will to extend this process to the other regions
where we
are present.
Afterwards, we chose the Rhône-Alpes region.
After
one year, we notice a significant
progress on our places of work, in terms of structures as well as in
terms of
our teams’ state of mind.
The 5S
method must be an integral part of our
daily activities.
The evolution of our sites and staff requires
this kind of process, even if it sometimes means reconsidering our
practices.
We are
convinced that, in this area, success
requires a daily recognition.
This is why we think that it is necessary to
dispose of 5S facilitators and referents.
This complementary training action, which PRISM
will be soon conducting, is in line with our ADF Group’s
strong will to make
the process durable.