Formation, Conseil, Coaching, Diagnostic,Optimisation des Couts,Organisation de la Qualité, Logistique de production, Industrialisation des produits, Optimisation des Délais, Démarche Lean manufacturing, Animation des KAIZEN, Optimisation de production, Optimisation des flux, Productivité, Ergonomie, Conditions de travail, Sécurité, Analyse du travail, Analyse fonctionnelle, Analyse de processus, Gestion des stocks, CMJ, consommation moyenne journaliere, Takt time, Lead time, Nomenclature, Gamme de fabrication, Planification, Planning de production, PERT, GANTT, Gestion de projet, Taux de Rendement Synthetique,TRS, Analyse de Processus, Définition des Procédés, Observations instantanées, Rendement des installations, Taux de service, Valeur ajoutée, Temps d’écoulement, Temps de cycle, Simogramme, Détermination des temps, Chronométrage, Jugement d'allure,Temps prédéterminés, MOST, MODAPTS, MTM, Analyse des modes de défaillance, AMDEC, Poka yoke, SMED, Single Minute Exchange of  Die, Changement de série, Organisation des approvisionnements, Etude de poste, Démarche 5S, Documents au poste, Kanban, Cahier des charges, Petit train d'approvisionnement, Equilibrage de ligne, Equilibrage de charge,Taux de saturation, Base de données, Chiffrage, Devis, Etude d'implantation, Gestion de Production Assistée par Ordinateur, GPAO, Ordre de fabrication, OF, MRP, Management de Ressources de Production, Maintenance des installations...

There are no translations available

 

Extrait de notre catalogue des formations en ligne.

Recevez notre catalogue des formations 2012 sur simple demande.(format papier ou PDF)

Read more...
 
There are no translations available

 

Vidéo Basic MOST® en ligne.

Visualisez notre vidéo de démonstration en ligne et appréciez la simpilicité d'utlisation du Basic MOST pour déterminer les temps de toutes vos activités.

Lire la suite...

 
English
Packaging Line in Woodwork PDF E-mail

Customer’s Demand

- Improving productivity on a furniture assembly-line

- Integrating different actors in this process

 

Key-Steps

- Training of actors on the process 

- Campaign of instant observations   

- Research of solutions on inactivity reasons with all actors   

- Setting-up of OEE calculation  

- Organization of storage and supply logic

- Stock output with supply list

- Study of exchange of die based on the most penalizing references   

- Timing and line balancing   

- Definition of standard documents on work stations

- Definition of standard times  

- Definition of the phases to be created in ERP (Enterprise Resource Planning)

- Adjustment and enforcement of production orders

- Validation of planning parameters and calculation of human resources

   

 Results

- OEE increase from 45% to 65%, ie a workforce gaining more than 3 000 h/year valued at 75K€ 

- Rationalization of working stations and storage areas adjustment

- Re-supplying of component stocks by pull flow

- Use of a unique supply list coming from ERP

- Changing of references in background time

- Line balancing on representative products with a saturation rate between 85% and 90% 

- Workstation documentation and simplified update 

- 55%-entry of operations in ERP in less than 3 months

 - Human-resources planning finally possible

           

Only 15 days of assistance spread on 10 months





Scooper cet article !Wikio !Taper cet article !Voter pour cet article !BlogMemes!Google!Facebook!Del.icio.us!
 
Next >

Facebook Like

Packaging Line in Woodwork | Actions
COGITE NORD, formation Basic MOST, temps prédéterminés HB.MAYNARD, formation Basic MOST, temps prédéterminés
In partnership with COGITE NORD,  official Distibutor of H.B MAYNARD.

Extrait de nos formations

Tous les outils pour l’optimisation des coûts et la réduction des délais de fabrication.

Derniers articles mis en ligne